The Jingye Group always puts environmental protection, energy conservation and emission reduction in the first place, and has invested more than 2 billion yuan in energy conservation and emission reduction, as well as circular economy, recycling all the gas, steam, slag and industrial water, realizing the simultaneous development of economic and environmental benefits.
Project Name: Overrall Frequency Conversion Transformation of a Steel Plant in Jingye Group
Project Background:
This project is an overall transformation of a steel plant in Jingye Metallurgical Plan. According to the content of the agreement, it is necessary to complete the frequency conversion transformation of several major pre-furnace de-dusting fans, ore chute de-dusting fans, auxiliary combustion fans and sintering main extraction fans in the metallurgical process. It has the characteristics of heavy transformation task and tight project implementation time. After the completion of the project, it is expected that the monthly electricity cost can be saved up to millions RMB of volume.
List of Equipment:
Name of user/Project | Voltage(kV) | Frequency conversion capacity(kVA) | Load (kW) | Qty(unit) | Load type | Industry | Remarks |
Hebei Jingye /Dedusting fan before 7#furnace | 10 | 1000 | 800 | 1 | Dedusting fan beforefurnace | Metallurgy | |
Hebei Jingye /Dedusting fan before 8#furnace | 10 | 1000 | 800 | 1 | Dedusting fan beforefurnace | Metallurgy | |
Hebei Jingye /New dedusting fan of 8#furnace | 10 | 1000 | 800 | 1 | Dedusting fan beforefurnace | Metallurgy | |
Hebei Jingye /Dedusting fan of 1# furnace | 10 | 1600 | 1400 | 1 | Dedusting fan before furnace | Metallurgy | |
Hebei Jingye /Dedusting fan before 9# furnace | 10 | 1750 | 1400 | 1 | Dedusting fan before furnace | Metallurgy | |
Hebei Jingye /Dedusting fan before 10# furnace | 10 | 1750 | 1400 | 1 | Dedusting fan before furnace | Metallurgy | |
Hebei Jingye /1#2#combustion fans of 9#frunace | 10 | 500 | 450 | 1 | Combustion fan | Metallurgy | One converter for two motors |
Hebei Jingye /1#2#combustion fans of 10#frunace | 10 | 500 | 450 | 1 | Combustion fan | Metallurgy | One converter for two motors |
Hebei Jingye / Dedusting fans of 9#frunace ore chute | 10 | 1000 | 800 | 1 | Dedusting fan of frunace ore chute | Metallurgy | |
Hebei Jingye / Dedusting fans of 10#frunace ore chute | 10 | 1000 | 800 | 1 | Dedusting fan of frunace ore chute | Metallurgy | |
Hebei Jingye / Dedusting fans of 11#frunace ore chute | 10 | 1250 | 1120 | 1 | Dedusting fan of frunace ore chute | Metallurgy | |
Hebei Jingye / Dedusting fans of 9#frunace ore chute | 10 | 1250 | 1120 | 1 | Dedusting fan of frunace ore chute | Metallurgy | |
Hebei Jingye / Dedusting fans before 14#frunace | 10 | 1750 | 1400 | 1 | Dedusting fan before furnace | Metallurgy | |
Hebei Jingye / Dedusting fans before 15#frunace | 10 | 1750 | 1400 | 1 | Dedusting fan before furnace | Metallurgy | |
Hebei Jingye / Dedusting fans before 16#frunace | 10 | 1750 | 1400 | 1 | Dedusting fan before furnace | Metallurgy | |
Hebei Jingye /1#2#combustion fans of 14#frunace | 10 | 710 | 560 | 2 | Combustion fan | Metallurgy | One converter for two motors |
Hebei Jingye /1#2#combustion fans of 15#frunace | 10 | 710 | 560 | 2 | Combustion fan | Metallurgy | One converter for two motors |
Hebei Jingye /1#2#combustion fans of 16#frunace | 10 | 710 | 560 | 2 | Combustion fan | Metallurgy | One converter for two motors |
Hebei Jingye /Coal injection main exhaust fan for 3#ironmaking | 10 | 1120 | 900 | 2 | Coal injection and smoke exhaust fan | Metallurgy | |
Hebei Jingye /1-7#upper tower pumps for 3#ironmaking | 10 | 710 | 560 | 7 | Upper tower pump | Metallurgy | |
Hebei Jingye /1-9#atmospheric pressure pumps for 3#ironmaking | 10 | 1000 | 800 | 8 | Atmospheric pressure pump | Metallurgy |